1+1 CAVITY MOULD
- Tier 1: Denso, Europe
- OEM: Peugeot
- Project: HVAC – Mould Developments
- Part Size: 419 X 336 X 225 & 379 X 349 X 285
- Cycle Time: 30 Sec
- Moulding Machine: 1300T

Product and Mould Challenges
- Mould quality at par with European standards of performance and cycle time
- Large number of critical dimensional requirements with extremely low tolerance levels
- Low general wall thickness – 1.6 mm
- Fast cycle time despite multiple and complex mechanisms on both halves
- TAT of 110 days to T1
DESIGN & CONSTRUCTION
- With CAE analysis on Mould flow, introduction of conformal cooling through 3D Printed inserts, shorter cycle time was achieved
- Mould design based on mechanically operated sliders and lifters in place of hydraulics, in order to further optimize cycle time and established at 28 secs
- Ease of mould maintenance due to front mounted design schemes for various inserts