1+1 CAVITY MOULD

  • Tier 1: Denso, Europe
  • OEM: Peugeot
  • Project: HVAC – Mould Developments
  • Part Size: 419 X 336 X 225 & 379 X 349 X 285
  • Cycle Time: 30 Sec
  • Moulding Machine: 1300T

Product and Mould Challenges

  • Mould quality at par with European standards of performance and cycle time
  • Large number of critical dimensional requirements with extremely low tolerance levels
  • Low general wall thickness – 1.6 mm
  • Fast cycle time despite multiple and complex mechanisms on both halves
  • TAT of 110 days to T1

DESIGN & CONSTRUCTION

  • With CAE analysis on Mould flow, introduction of conformal cooling through 3D Printed inserts, shorter cycle time was achieved
  • Mould design based on mechanically operated sliders and lifters in place of hydraulics, in order to further optimize cycle time and established at 28 secs
  • Ease of mould maintenance due to front mounted design schemes for various inserts